Table of contents
Along the way
2Charging points along the way
23 chargers
- Shell Gas Station/BJ's - Tesla Supercharger250 kW
- CircleK - Wenatchee, WA150 kW
- DCPUD HQ PL 2150 kW
- DCPUD WELLS DAM PL 2150 kW
- Pat Armstrong Ford150 kW
Data source: OpenChargeMap
Top attractions along the route
No notable attractions were found along this route.
Book
2Find hotels near Wenatchee, WA
Rent a car near Pateros, WA
Explore
Popular routes from destination
Popular destinations close by
Wenatchee, WA → Leavenworth, WAWenatchee, WA → Quincy, WAWenatchee, WA → East Wenatchee, WAWenatchee, WA → South Wenatchee, WAWenatchee, WA → Pangborn Memorial Airport (EAT)Wenatchee, WA → Cashmere, WA
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .
Overview
Questions and answers
- How far is it from Pateros, WA, {fromState} to Wenatchee, WA, {toState}?
- The distance between Pateros, WA, {fromState} and Wenatchee, WA, {toState} is 58 mi by road.
- How long does it take to drive from Pateros, WA, {fromState} to Wenatchee, WA, {toState}?
- The drive from Pateros, WA, {fromState} to Wenatchee, WA, {toState} takes approximately 1 h 20 min by car.
- What is the best route from Pateros, WA, {fromState} to Wenatchee, WA, {toState}?
- The fastest route from Pateros, WA, {fromState} to Wenatchee, WA, {toState} covers 58 mi with a driving time of approximately 1 h 20 min.
- Which direction is Wenatchee, WA from Pateros, WA?
- Wenatchee, WA lies roughly to the south-west of Pateros, WA.
- Which roads does the route from Pateros, WA to Wenatchee, WA follow?
- The drive from Pateros, WA to Wenatchee, WA mainly follows US 97.
- Which towns do you pass between Pateros, WA and Wenatchee, WA?
- Towns on the route from Pateros, WA to Wenatchee, WA include Chelan, Entiat, Cashmere.
- Are there charging stations between Pateros, WA and Wenatchee, WA?
- Yes. You can charge along the route from Pateros, WA to Wenatchee, WA, including Shell Gas Station/BJ's - Tesla Supercharger (250 kW); CircleK - Wenatchee, WA (150 kW); DCPUD HQ PL 2 (150 kW). Charging points on this route: 23.
