Whitesburg, GANewnan, GA
Start a new route?
Driving from Whitesburg, GA to Newnan, GA takes about via US 27 Alternate; GA 16. The distance is 13 mi. The straight-line distance is 12 mi. Driving directions
Driving directions
15 · 13 mi- 1 Depart straight 34 yd
- 2 Turn right onto Main Street 1 mi
- 3 Enter roundabout slightly right onto Main Street 20 yd
- 4 Exit roundabout slightly right onto Main Street 10 mi
- 5 Continue straight onto Clark Street 1 mi
- 6 Turn right onto Jackson Street 1 mi
- 7 Turn left onto Posey Place 94 yd
- 8 Turn left onto Jefferson Street 1 mi
- 9 Continue straight onto Bullsboro Drive 1 mi
- 10 Turn right onto Greison Trail 1 mi
- 11 Enter roundabout right onto McIntosh Parkway 92 yd
- 12 Exit roundabout right onto McIntosh Parkway 1 mi
- 13 Turn right onto Brown Ridge Drive 1 mi
- 14 Turn right onto Jacks Drive 94 yd
- 15 Arrive right onto Jacks Drive
The return trip from Newnan, GA to Whitesburg, GA covers roughly the same distance, 13 mi.
Popular destinations close by
Questions and answers
Newnan, GA lies roughly to the south-east of Whitesburg, GA.
How far is it from Whitesburg, GA, {fromState} to Newnan, GA, {toState}?
The distance between Whitesburg, GA, {fromState} and Newnan, GA, {toState} is 13 mi by road.
How long does it take to drive from Whitesburg, GA, {fromState} to Newnan, GA, {toState}?
The drive from Whitesburg, GA, {fromState} to Newnan, GA, {toState} takes approximately 25 min by car.
What is the best route from Whitesburg, GA, {fromState} to Newnan, GA, {toState}?
The fastest route from Whitesburg, GA, {fromState} to Newnan, GA, {toState} covers 13 mi with a driving time of approximately 25 min.
What is the shortest route from Whitesburg, GA to Newnan, GA?
The shortest driving route from Whitesburg, GA to Newnan, GA is about 13 mi by road.
Are there charging stations between Whitesburg, GA and Newnan, GA?
Yes. You can charge along the route from Whitesburg, GA to Newnan, GA, including Target - Tesla Supercharger (250 kW), Newnan (150 kW), OPTIMUS ENERGY NEWNAN BK DC2 (150 kW). Charging points on this route: 12.
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

