Shepherdsville, KYMount Washington, KY
Start a new route?
Driving from Shepherdsville, KY to Mount Washington, KY takes about via KY 44. The distance is 11 mi. The straight-line distance is 9 mi. Driving directions
Driving directions
14 · 11 mi- 1 Depart right onto Dawson Drive 1 mi
- 2 Continue right onto Dawson Drive 157 yd
- 3 At end of road, turn left onto Dawson Drive 123 yd
- 4 Turn left onto Cedar Grove Road 1 mi
- 5 Take ramp slightly left 1 mi
- 6 Merge slightly left onto Kentucky Turnpike 1 mi
- 7 Take exit slightly right 1 mi
- 8 Turn right onto Highway 44 East 2 mi
- 9 Continue straight onto Old Mill Road 8 mi
- 10 Turn left onto Green Tree Lane 1 mi
- 11 Turn right onto West Woodlake Circle 109 yd
- 12 Turn right onto Lakewood Drive 1 mi
- 13 Turn left 60 yd
- 14 Arrive right
The return trip from Mount Washington, KY to Shepherdsville, KY covers roughly the same distance, 11 mi.
Popular destinations close by
Questions and answers
Mount Washington, KY lies roughly to the north-east of Shepherdsville, KY.
How far is it from Shepherdsville, KY, {fromState} to Mount Washington, KY, {toState}?
The distance between Shepherdsville, KY, {fromState} and Mount Washington, KY, {toState} is 11 mi by road.
How long does it take to drive from Shepherdsville, KY, {fromState} to Mount Washington, KY, {toState}?
The drive from Shepherdsville, KY, {fromState} to Mount Washington, KY, {toState} takes approximately 25 min by car.
What is the best route from Shepherdsville, KY, {fromState} to Mount Washington, KY, {toState}?
The fastest route from Shepherdsville, KY, {fromState} to Mount Washington, KY, {toState} covers 11 mi with a driving time of approximately 25 min.
What is the shortest route from Shepherdsville, KY to Mount Washington, KY?
The shortest driving route from Shepherdsville, KY to Mount Washington, KY is about 11 mi by road.
Are there charging stations between Shepherdsville, KY and Mount Washington, KY?
Yes. You can charge along the route from Shepherdsville, KY to Mount Washington, KY, including Meijer - Tesla Supercharger (250 kW), Bernheim Arboretum & Research Forest (7 kW), Bernheim Fortest - PLAYCO Parking Lot (7 kW). Charging points on this route: 9.
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

