Seven Devils, NCMountain City, TN
Start a new route?
Driving from Seven Devils, NC to Mountain City, TN takes about via US 321; US 421. The distance is 32 mi. The straight-line distance is 23 mi. EV charging is available along the route, including in Seven Devils, NC, Cove Creek, NC, Mountain City, TN. Driving directions
Driving directions
13 · 32 mi- 1 Depart right onto Skyland Drive 1 mi
- 2 Continue right onto Seven Devils Road 2 mi
- 3 At end of road, turn left onto Seven Devils Road 1 mi
- 4 At end of road, turn left onto NC Highway 105 South 5 mi
- 5 Turn left onto Broadstone Road 3 mi
- 6 Continue straight 4 mi
- 7 Turn right 1 mi
- 8 At end of road, turn left 10 mi
- 9 Continue straight 9 mi
- 10 Turn right 1 mi
- 11 Turn left onto Atwood Street 76 yd
- 12 Turn right onto 911 Avenue 22 yd
- 13 Arrive left onto 911 Avenue
The return trip from Mountain City, TN to Seven Devils, NC covers roughly the same distance, 32 mi.
Popular destinations close by
Questions and answers
Mountain City, TN lies roughly to the north of Seven Devils, NC.
How far is it from Seven Devils, NC, {fromState} to Mountain City, TN, {toState}?
The distance between Seven Devils, NC, {fromState} and Mountain City, TN, {toState} is 32 mi by road.
How long does it take to drive from Seven Devils, NC, {fromState} to Mountain City, TN, {toState}?
The drive from Seven Devils, NC, {fromState} to Mountain City, TN, {toState} takes approximately 55 min by car.
What is the best route from Seven Devils, NC, {fromState} to Mountain City, TN, {toState}?
The fastest route from Seven Devils, NC, {fromState} to Mountain City, TN, {toState} covers 32 mi with a driving time of approximately 55 min.
What is the shortest route from Seven Devils, NC to Mountain City, TN?
The shortest driving route from Seven Devils, NC to Mountain City, TN is about 32 mi by road.
Are there charging stations between Seven Devils, NC and Mountain City, TN?
Yes. You can charge along the route from Seven Devils, NC to Mountain City, TN, including CVS - Tesla Supercharger (250 kW), Blowing Rock, NC (200 kW), BLUERIDGEENERGY BOONE DC FAST (150 kW). Charging points on this route: 32.
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

