Oakland, KYBowling Green, KY
Start a new route?
Driving from Oakland, KY to Bowling Green, KY takes about via I 65. The distance is 16 mi. The straight-line distance is 12 mi. Driving directions
Driving directions
16 · 16 mi- 1 Depart left 23 yd
- 2 Turn straight onto Vine Street 1 mi
- 3 Turn right onto Church Street 1 mi
- 4 At end of road, turn left onto Glasgow Road 1 mi
- 5 Take ramp slightly right 1 mi
- 6 Merge slightly left 10 mi
- 7 Take exit slightly right 1 mi
- 8 Turn right onto Cemetery Road 2 mi
- 9 Continue straight onto Fairview Avenue 2 mi
- 10 Turn left onto 31-W By-Pass 1 mi
- 11 Turn left onto Broadway Avenue 1 mi
- 12 Continue straight onto Scottsville Road 1 mi
- 13 Turn right onto Oliver Street 1 mi
- 14 Turn left onto Benson Avenue 1 mi
- 15 Turn left onto Elizabeth Street 116 yd
- 16 Arrive right onto Elizabeth Street
The return trip from Bowling Green, KY to Oakland, KY covers roughly the same distance, 16 mi.
Popular destinations close by
Questions and answers
Bowling Green, KY lies roughly to the south-west of Oakland, KY.
How far is it from Oakland, KY, {fromState} to Bowling Green, KY, {toState}?
The distance between Oakland, KY, {fromState} and Bowling Green, KY, {toState} is 16 mi by road.
How long does it take to drive from Oakland, KY, {fromState} to Bowling Green, KY, {toState}?
The drive from Oakland, KY, {fromState} to Bowling Green, KY, {toState} takes approximately 25 min by car.
What is the best route from Oakland, KY, {fromState} to Bowling Green, KY, {toState}?
The fastest route from Oakland, KY, {fromState} to Bowling Green, KY, {toState} covers 16 mi with a driving time of approximately 25 min.
What is the shortest route from Oakland, KY to Bowling Green, KY?
The shortest driving route from Oakland, KY to Bowling Green, KY is about 16 mi by road.
Are there charging stations between Oakland, KY and Bowling Green, KY?
Yes. You can charge along the route from Oakland, KY to Bowling Green, KY, including National Corvette Museum (Bowling Green, KY) (350 kW), Buc-ee's - Tesla Supercharger (250 kW), Meijer - Tesla Supercharger (250 kW). Charging points on this route: 19.
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

