Table of contents
Along the way
2Charging points along the way
190 chargers
- Archdale Marketplace350 kW
- Blakeney350 kW
- BOA Center City NC2-181 (Charlotte, NC)350 kW
- Carmel Commons350 kW
- Flying J Travel Center 711350 kW
Data source: OpenChargeMap
Top attractions along the route
No notable attractions were found along this route.
Book
2Find hotels near Pineville, NC
Rent a car near Mooresboro, NC
Explore
Popular routes from destination
Popular destinations close by
Pineville, NC → Gaffney, SCPineville, NC → Belmont, NCPineville, NC → Mint Hill, NCPineville, NC → Stanley, NCPineville, NC → Wingate, NCPineville, NC → Sharon, SC
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .
Overview
Questions and answers
- How far is it from Mooresboro, NC, {fromState} to Pineville, NC, {toState}?
- The distance between Mooresboro, NC, {fromState} and Pineville, NC, {toState} is 59 mi by road.
- How long does it take to drive from Mooresboro, NC, {fromState} to Pineville, NC, {toState}?
- The drive from Mooresboro, NC, {fromState} to Pineville, NC, {toState} takes approximately 1 h 20 min by car.
- What is the best route from Mooresboro, NC, {fromState} to Pineville, NC, {toState}?
- The fastest route from Mooresboro, NC, {fromState} to Pineville, NC, {toState} covers 59 mi with a driving time of approximately 1 h 20 min.
- Which direction is Pineville, NC from Mooresboro, NC?
- Pineville, NC lies roughly to the east of Mooresboro, NC.
- Which roads does the route from Mooresboro, NC to Pineville, NC follow?
- The drive from Mooresboro, NC to Pineville, NC mainly follows US 74, I 85.
- Which towns do you pass between Mooresboro, NC and Pineville, NC?
- Towns on the route from Mooresboro, NC to Pineville, NC include Shelby, Cherryville, Gastonia, Mount Holly, Charlotte.
- Are there charging stations between Mooresboro, NC and Pineville, NC?
- Yes. You can charge along the route from Mooresboro, NC to Pineville, NC, including Archdale Marketplace (350 kW); Blakeney (350 kW); BOA Center City NC2-181 (Charlotte, NC) (350 kW). Charging points on this route: 190.
