Long Beach, INTown of Pines, IN
Start a new route?
Driving from Long Beach, IN to Town of Pines, IN takes about via US 12. The distance is 8 mi. The straight-line distance is 7 mi. Driving directions
Driving directions
15 · 8 mi- 1 Depart right onto Grassmere Drive 30 yd
- 2 Turn left onto Florimond Drive 1 mi
- 3 Turn left onto Chastleton Drive 161 yd
- 4 Continue straight onto Avondale Drive 1 mi
- 5 Continue slightly left onto North Karwick Road 1 mi
- 6 Turn right onto US-12 2 mi
- 7 Continue straight onto 2nd Street 1 mi
- 8 Continue straight onto West Michigan Boulevard 1 mi
- 9 Continue straight onto East Michigan Boulevard 1 mi
- 10 Continue straight onto West 4th Street 1 mi
- 11 Continue straight onto US-12 2 mi
- 12 Continue straight onto US-12 1 mi
- 13 Continue straight onto West Dunes Highway 2 mi
- 14 Turn right 55 yd
- 15 Arrive right
The return trip from Town of Pines, IN to Long Beach, IN covers roughly the same distance, 8 mi.
Popular destinations close by
Questions and answers
Town of Pines, IN lies roughly to the south-west of Long Beach, IN.
How far is it from Long Beach, IN, {fromState} to Town of Pines, IN, {toState}?
The distance between Long Beach, IN, {fromState} and Town of Pines, IN, {toState} is 8 mi by road.
How long does it take to drive from Long Beach, IN, {fromState} to Town of Pines, IN, {toState}?
The drive from Long Beach, IN, {fromState} to Town of Pines, IN, {toState} takes approximately 20 min by car.
What is the best route from Long Beach, IN, {fromState} to Town of Pines, IN, {toState}?
The fastest route from Long Beach, IN, {fromState} to Town of Pines, IN, {toState} covers 8 mi with a driving time of approximately 20 min.
What is the shortest route from Long Beach, IN to Town of Pines, IN?
The shortest driving route from Long Beach, IN to Town of Pines, IN is about 8 mi by road.
Are there charging stations between Long Beach, IN and Town of Pines, IN?
Yes. You can charge along the route from Long Beach, IN to Town of Pines, IN, including Indian Boundary Plaza - Tesla Supercharger (250 kW), Michigan City - Tesla Supercharger (250 kW), OZINGA NEW BUFFALO MI (150 kW). Charging points on this route: 17.
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

