Jefferson, SCMayesville, SC
Start a new route?
Driving from Jefferson, SC to Mayesville, SC takes about via SC 154. The distance is 58 mi. The straight-line distance is 48 mi. EV charging is available along the route, including in McBee, SC, Bishopville, SC. Driving directions
Driving directions
14 · 58 mi- 1 Depart right onto Lee Street 1 mi
- 2 Turn right onto Elizabeth Street 1 mi
- 3 Turn right onto State Hwy 151 Bypass 17 mi
- 4 Turn right onto South 7th Street 7 mi
- 5 Continue straight onto King Street East 1 mi
- 6 Turn left onto Main Street South 1 mi
- 7 Continue straight onto Bethune Road 5 mi
- 8 Turn straight onto Bethune Highway 10 mi
- 9 Turn straight onto North Main Street 3 mi
- 10 Continue straight onto Sumter Highway 1 mi
- 11 Turn left onto St Charles Highway 16 mi
- 12 Continue straight onto North Lafayette Street 2 mi
- 13 Turn sharp left onto Florence Highway 1 mi
- 14 Arrive right onto Florence Highway
The return trip from Mayesville, SC to Jefferson, SC covers roughly the same distance, 58 mi.
Popular destinations close by
Questions and answers
Mayesville, SC lies roughly to the south of Jefferson, SC.
How far is it from Jefferson, SC, {fromState} to Mayesville, SC, {toState}?
The distance between Jefferson, SC, {fromState} and Mayesville, SC, {toState} is 58 mi by road.
How long does it take to drive from Jefferson, SC, {fromState} to Mayesville, SC, {toState}?
The drive from Jefferson, SC, {fromState} to Mayesville, SC, {toState} takes approximately 1 h 30 min by car.
What is the best route from Jefferson, SC, {fromState} to Mayesville, SC, {toState}?
The fastest route from Jefferson, SC, {fromState} to Mayesville, SC, {toState} covers 58 mi with a driving time of approximately 1 h 30 min.
What is the shortest route from Jefferson, SC to Mayesville, SC?
The shortest driving route from Jefferson, SC to Mayesville, SC is about 58 mi by road.
Are there charging stations between Jefferson, SC and Mayesville, SC?
Yes. You can charge along the route from Jefferson, SC to Mayesville, SC, including Exxon - Tesla Supercharger (250 kW), Refuel Market - Tesla Supercharger (250 kW), OPTIMUS CPO BTC BISHOPVLLE1 (150 kW). Charging points on this route: 9.
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

