Skip, RouteMap's route guideRouteplanner.app
Routeplanner.app

Hodges, SCWaterloo, SC

Distance: 19 mi·Duration: 30 min

Save for offline?

We'll download this route and its map area so it works without a connection. This can take a moment -- you can keep using the app while it finishes.

Driving from Hodges, SC to Waterloo, SC takes about via SC 246. The distance is 19 mi. The straight-line distance is 12 mi. Driving directions

Driving directions

12 · 19 mi
  1. 1 Depart onto Townsend Road East 39 yd
  2. 2 At end of road, turn right onto Moorefield Street 1 mi
  3. 3 Turn slightly left onto Emerson Street 1 mi
  4. 4 Continue straight onto Vernon Smith Road 1 mi
  5. 5 Continue straight onto State Highway 246 2 mi
  6. 6 Continue straight onto Village Road 1 mi
  7. 7 Continue straight onto Robertson Street 1 mi
  8. 8 Continue straight onto State Highway 246 6 mi
  1. 9 Turn left 4 mi
  2. 10 Turn left onto Greenwood Highway 5 mi
  3. 11 Turn left 47 yd
  4. 12 Arrive straight

The return trip from Waterloo, SC to Hodges, SC covers roughly the same distance, 19 mi.

Questions and answers

Waterloo, SC lies roughly to the north-east of Hodges, SC.

How far is it from Hodges, SC, {fromState} to Waterloo, SC, {toState}?

The distance between Hodges, SC, {fromState} and Waterloo, SC, {toState} is 19 mi by road.

How long does it take to drive from Hodges, SC, {fromState} to Waterloo, SC, {toState}?

The drive from Hodges, SC, {fromState} to Waterloo, SC, {toState} takes approximately 30 min by car.

What is the best route from Hodges, SC, {fromState} to Waterloo, SC, {toState}?

The fastest route from Hodges, SC, {fromState} to Waterloo, SC, {toState} covers 19 mi with a driving time of approximately 30 min.

What is the shortest route from Hodges, SC to Waterloo, SC?

The shortest driving route from Hodges, SC to Waterloo, SC is about 19 mi by road.

Are there charging stations between Hodges, SC and Waterloo, SC?

Yes. You can charge along the route from Hodges, SC to Waterloo, SC, including Spinx - Tesla Supercharger (250 kW), OPTIMUS CPO BTC GREENWOOD 1 (150 kW), 220 Maxwell Avenue (7 kW). Charging points on this route: 8.

Sources

Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .