Skip to content

Table of contents

Charging points along the way

435 chargers

  • 1310 W Baseline RdCCS, CHAdeMO · 1310 W Baseline Rd, Rialto, CA, 92376350 kW
  • 4 Gen Logistics Green City (Rialto, CA)CCS · 2298 Stonehurst Drive, Rialto, CA, 92377350 kW
  • Albertson'sCCS, CHAdeMO, Type1 · 1601 S Melrose Dr, Vista, CA, 92081350 kW
  • BoA CA0-163 (San Diego, CA)CCS · 16849 Bernardo Ctr Dr, San Diego, CA, 92128350 kW
  • Chase Bank - 1467 Main StCCS, CHAdeMO · 1467 Main St, Ramona, CA, 92065350 kW

EV Charging Stations

Data source: OpenChargeMap

Top attractions along the route

No notable attractions were found along this route.

Find hotels near Poway, CA

Rent a car near Fontana, CA

Popular routes from destination

Popular destinations close by

Sources

Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

Questions and answers

How far is it from Fontana, CA, {fromState} to Poway, CA, {toState}?
The distance between Fontana, CA, {fromState} and Poway, CA, {toState} is 93 mi by road.
How long does it take to drive from Fontana, CA, {fromState} to Poway, CA, {toState}?
The drive from Fontana, CA, {fromState} to Poway, CA, {toState} takes approximately 2 h by car.
What is the best route from Fontana, CA, {fromState} to Poway, CA, {toState}?
The fastest route from Fontana, CA, {fromState} to Poway, CA, {toState} covers 93 mi with a driving time of approximately 2 h.
Which direction is Poway, CA from Fontana, CA?
Poway, CA lies roughly to the south of Fontana, CA.
Which roads does the route from Fontana, CA to Poway, CA follow?
The drive from Fontana, CA to Poway, CA mainly follows I 215 Truck, I 15. The longest single stretch is 37 mi on I 215 Truck.
Which towns do you pass between Fontana, CA and Poway, CA?
Towns on the route from Fontana, CA to Poway, CA include Riverside, Murrieta, Escondido.
Are there charging stations between Fontana, CA and Poway, CA?
Yes. You can charge along the route from Fontana, CA to Poway, CA, including 1310 W Baseline Rd (350 kW); 4 Gen Logistics Green City (Rialto, CA) (350 kW); Albertson's (350 kW). Charging points on this route: 450.

Share Route

Save for offline?

We'll download this route and its map area so it works without a connection. This can take a moment -- you can keep using the app while it finishes.