East Germantown, INGreensburg, IN
Start a new route?
Driving from East Germantown, IN to Greensburg, IN takes about via SR 3. The distance is 50 mi. The straight-line distance is 38 mi. EV charging is available along the route, including in Dunreith, IN, Rushville, IN, Greensburg, IN. Driving directions
Driving directions
12 · 50 mi- 1 Depart left onto Main Street 5 mi
- 2 Continue straight onto National Road 4 mi
- 3 Continue straight onto Washington Street 2 mi
- 4 Continue straight onto National Road 3 mi
- 5 Continue straight onto East Main Street 1 mi
- 6 Continue straight onto National Road 5 mi
- 7 Continue straight onto Washington Street 1 mi
- 8 Continue straight onto National Road 1 mi
- 9 Turn left 14 mi
- 10 Turn right 19 mi
- 11 Turn right 1 mi
- 12 Arrive right
The return trip from Greensburg, IN to East Germantown, IN covers roughly the same distance, 50 mi.
Popular destinations close by
Questions and answers
Greensburg, IN lies roughly to the south-west of East Germantown, IN.
How far is it from East Germantown, IN, {fromState} to Greensburg, IN, {toState}?
The distance between East Germantown, IN, {fromState} and Greensburg, IN, {toState} is 50 mi by road.
How long does it take to drive from East Germantown, IN, {fromState} to Greensburg, IN, {toState}?
The drive from East Germantown, IN, {fromState} to Greensburg, IN, {toState} takes approximately 1 h 15 min by car.
What is the best route from East Germantown, IN, {fromState} to Greensburg, IN, {toState}?
The fastest route from East Germantown, IN, {fromState} to Greensburg, IN, {toState} covers 50 mi with a driving time of approximately 1 h 15 min.
What is the shortest route from East Germantown, IN to Greensburg, IN?
The shortest driving route from East Germantown, IN to Greensburg, IN is about 50 mi by road.
Are there charging stations between East Germantown, IN and Greensburg, IN?
Yes. You can charge along the route from East Germantown, IN to Greensburg, IN, including Spiceland Truck and Auto Plaza - Tesla Supercharger (250 kW), New Castle (150 kW), Building 10 Chargers (7 kW). Charging points on this route: 12.
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

