Table of contents
Along the way
2Charging points along the way
4 chargers
Longest stretch on this route with no charging point: 42 mi
- PROSTROLLOAUTO PROSTROLLO 01150 kW
- Brookings Activity Center SD50 kW
- CITY STATION BROOKINGS 17.2 kW
- Einspahr Ford7.2 kW
Data source: OpenChargeMap
Top attractions along the route
No notable attractions were found along this route.
Book
2Find hotels near Bushnell, SD
Rent a car near Artesian, SD
Explore
Popular routes from destination
Popular destinations close by
Bushnell, SD → Lake Benton, MNBushnell, SD → Brookings Regional Airport (BKX)Bushnell, SD → White, SDBushnell, SD → Brookings, SDBushnell, SD → Elkton, SDBushnell, SD → Aurora, SD
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .
Overview
Questions and answers
- How far is it from Artesian, SD, {fromState} to Bushnell, SD, {toState}?
- The distance between Artesian, SD, {fromState} and Bushnell, SD, {toState} is 90 mi by road.
- How long does it take to drive from Artesian, SD, {fromState} to Bushnell, SD, {toState}?
- The drive from Artesian, SD, {fromState} to Bushnell, SD, {toState} takes approximately 2 h by car.
- What is the best route from Artesian, SD, {fromState} to Bushnell, SD, {toState}?
- The fastest route from Artesian, SD, {fromState} to Bushnell, SD, {toState} covers 90 mi with a driving time of approximately 2 h.
- Which direction is Bushnell, SD from Artesian, SD?
- Bushnell, SD lies roughly to the east of Artesian, SD.
- Which roads does the route from Artesian, SD to Bushnell, SD follow?
- The drive from Artesian, SD to Bushnell, SD mainly follows SD 34, I 29. The longest single stretch is 59 mi on SD 34.
- Which towns do you pass between Artesian, SD and Bushnell, SD?
- Towns on the route from Artesian, SD to Bushnell, SD include Madison, Brookings.
- Are there charging stations between Artesian, SD and Bushnell, SD?
- Yes. You can charge along the route from Artesian, SD to Bushnell, SD, including PROSTROLLOAUTO PROSTROLLO 01 (150 kW); Brookings Activity Center SD (50 kW); CITY STATION BROOKINGS 1 (7 kW). Charging points on this route: 4.
