Antioch, INBainbridge, IN
Start a new route?
Driving from Antioch, IN to Bainbridge, IN takes about via SR 39. The distance is 52 mi. The straight-line distance is 37 mi. Driving directions
Driving directions
16 · 52 mi- 1 Depart right 10 yd
- 2 Turn right onto State Road 39 8 mi
- 3 Turn right onto IN-47 2 mi
- 4 Take ramp left 1 mi
- 5 Merge slightly left 7 mi
- 6 Take exit slightly right 1 mi
- 7 Turn right onto South Lebanon Street 9 mi
- 8 Continue straight onto County Road 50 West 3 mi
- 9 Continue straight onto North State Street 4 mi
- 10 Continue straight onto County Road 100 West 5 mi
- 11 Continue straight onto Urban Street 1 mi
- 12 At end of road, turn right onto West Main Street 2 mi
- 13 Continue straight onto Ernie Pyle Memorial Highway 14 mi
- 14 Turn left onto North Green Street 93 yd
- 15 Turn right onto East Main Street 85 yd
- 16 Arrive right onto East Main Street
The return trip from Bainbridge, IN to Antioch, IN covers roughly the same distance, 52 mi.
Popular destinations close by
Questions and answers
Bainbridge, IN lies roughly to the south-west of Antioch, IN.
How far is it from Antioch, IN, {fromState} to Bainbridge, IN, {toState}?
The distance between Antioch, IN, {fromState} and Bainbridge, IN, {toState} is 52 mi by road.
How long does it take to drive from Antioch, IN, {fromState} to Bainbridge, IN, {toState}?
The drive from Antioch, IN, {fromState} to Bainbridge, IN, {toState} takes approximately 1 h 20 min by car.
What is the best route from Antioch, IN, {fromState} to Bainbridge, IN, {toState}?
The fastest route from Antioch, IN, {fromState} to Bainbridge, IN, {toState} covers 52 mi with a driving time of approximately 1 h 20 min.
What is the shortest route from Antioch, IN to Bainbridge, IN?
The shortest driving route from Antioch, IN to Bainbridge, IN is about 52 mi by road.
Are there charging stations between Antioch, IN and Bainbridge, IN?
Yes. You can charge along the route from Antioch, IN to Bainbridge, IN, including Flying J 652 (350 kW), Lebanon Crossing - Tesla Supercharger (250 kW), Meijer - Tesla Supercharger (250 kW). Charging points on this route: 11.
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

