Altona, INPeru, IN
Start a new route?
Driving from Altona, IN to Peru, IN takes about via US 24. The distance is 84 mi. The straight-line distance is 64 mi. EV charging is available along the route, including in Huntertown, IN, Fort Wayne, IN, Lagro, IN, Wabash, IN. Driving directions
Driving directions
18 · 84 mi- 1 Depart left 51 yd
- 2 Turn right 59 yd
- 3 Turn left onto West Quincy Street 1 mi
- 4 Continue straight onto North Union Street 166 yd
- 5 Turn left onto West King Street 1 mi
- 6 Turn right onto South Randolph Street 2 mi
- 7 Turn left onto County Road 56 3 mi
- 8 Continue straight onto County Road 11A 1 mi
- 9 Take ramp right 1 mi
- 10 Merge slightly left 30 mi
- 11 Take exit slightly right 1 mi
- 12 Continue straight onto Lafayette Center Road 2 mi
- 13 Continue straight onto East 900 North 2 mi
- 14 Turn left 12 mi
- 15 Continue right onto Wabash Road 32 mi
- 16 Turn left onto North Broadway 2 mi
- 17 Turn right onto Boulevard 1 mi
- 18 Arrive right onto Boulevard
The return trip from Peru, IN to Altona, IN covers roughly the same distance, 84 mi.
Popular destinations close by
Questions and answers
Peru, IN lies roughly to the south-west of Altona, IN.
How far is it from Altona, IN, {fromState} to Peru, IN, {toState}?
The distance between Altona, IN, {fromState} and Peru, IN, {toState} is 84 mi by road.
How long does it take to drive from Altona, IN, {fromState} to Peru, IN, {toState}?
The drive from Altona, IN, {fromState} to Peru, IN, {toState} takes approximately 1 h 50 min by car.
What is the best route from Altona, IN, {fromState} to Peru, IN, {toState}?
The fastest route from Altona, IN, {fromState} to Peru, IN, {toState} covers 84 mi with a driving time of approximately 1 h 50 min.
What is the shortest route from Altona, IN to Peru, IN?
The shortest driving route from Altona, IN to Peru, IN is about 84 mi by road.
Are there charging stations between Altona, IN and Peru, IN?
Yes. You can charge along the route from Altona, IN to Peru, IN, including Meijer - Tesla Supercharger (250 kW), Meijer - Tesla Supercharger (250 kW), Ben Davis Ford (150 kW). Charging points on this route: 54.
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

