Skip to content

Table of contents

Charging points along the way

9 chargers

  • Ballater Road, AboyneBallater Road, Aboyne, AB34 5HT50 kW
  • Station Brae, AboyneStation Brae, Aboyne, Aberdeenshire, AB34 5HT50 kW
  • Bellfield Car Park, BanchoryBellfield Car Park, Banchory, Aberdeenshire, AB31 5XS22 kW
  • Garlogie, WesthillGarlogie, Westhill, Aberdeenshire, AB32 6RX22 kW
  • Provost Webster Road, BanchoryProvost Webster Road, Banchory, AB31 5BL22 kW

EV Charging Points

Data source: OpenChargeMap

Top attractions along the route

No notable attractions were found along this route.

Find hotels near Pinecrest

Rent a car near Strachan

Popular routes from destination

Popular destinations close by

Sources

Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

Questions and answers

How far is it from Strachan to Pinecrest?
The distance between Strachan and Pinecrest is 6 mi by road.
How long does it take to drive from Strachan to Pinecrest?
The drive from Strachan to Pinecrest takes approximately 15 min by car.
What is the best route from Strachan to Pinecrest?
The fastest route from Strachan to Pinecrest covers 6 mi with a driving time of approximately 15 min.
Which direction is Pinecrest from Strachan?
Pinecrest lies roughly to the north of Strachan.
Are there charging stations between Strachan and Pinecrest?
Yes. You can charge along the route from Strachan to Pinecrest, including Ballater Road, Aboyne (50 kW); Station Brae, Aboyne (50 kW); Bellfield Car Park, Banchory (22 kW). Charging points on this route: 9.

Share Route

Save for offline?

We'll download this route and its map area so it works without a connection. This can take a moment -- you can keep using the app while it finishes.