Skip to content

Table of contents

Charging points along the way

41 chargers

  • Eastgate, PickeringEastgate, Pickering, YO18 7DP75 kW
  • North Yorkshire Council, Ropery, Ryedale, PickeringNorth Yorkshire Council, Ropery, Ryedale, Pickering, YO18 8DY75 kW
  • Castlegate, MaltonCastlegate, Malton, YO17 7DT60 kW
  • 18 Birdgate, Pickering18 Birdgate, Pickering, England, YO18 7AL50 kW
  • 25 Saint Nicholas Street, Norton25 Saint Nicholas Street, Norton, Malton, YO17 9AQ50 kW

EV Charging Points

Data source: OpenChargeMap

Top attractions along the route

No notable attractions were found along this route.

Find hotels near Fimber

Rent a car near Raw

Popular routes from destination

Popular destinations close by

Sources

Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

Questions and answers

How far is it from Raw to Fimber?
The distance between Raw and Fimber is 45 mi by road.
How long does it take to drive from Raw to Fimber?
The drive from Raw to Fimber takes approximately 1 h 10 min by car.
What is the best route from Raw to Fimber?
The fastest route from Raw to Fimber covers 45 mi with a driving time of approximately 1 h 10 min.
Which direction is Fimber from Raw?
Fimber lies roughly to the south of Raw.
Which roads does the route from Raw to Fimber follow?
The drive from Raw to Fimber mainly follows A169.
Which towns do you pass between Raw and Fimber?
Towns on the route from Raw to Fimber include Whitby, Glaisdale, Pickering, Malton, Bishop Wilton.
Are there charging stations between Raw and Fimber?
Yes. You can charge along the route from Raw to Fimber, including Eastgate, Pickering (75 kW); North Yorkshire Council, Ropery, Ryedale, Pickering (75 kW); Castlegate, Malton (60 kW). Charging points on this route: 41.

Share Route

Save for offline?

We'll download this route and its map area so it works without a connection. This can take a moment -- you can keep using the app while it finishes.