Skip to content

Table of contents

Charging points along the way

173 chargers

  • John Lewis, BristolJohn Lewis, Bristol, BS34 5QU250 kW
  • 95 Newfoundland Road, Bristol95 Newfoundland Road, Bristol, BS2 9LU150 kW
  • Arnos Vale, BristolArnos Vale, Bristol, BS4 3BD150 kW
  • First Field Way, PatchwayFirst Field Way, Patchway, England, BS34 5TN150 kW
  • Lysander Road, BristolLysander Road, Bristol, BS10 7DD 150 kW

EV Charging Points

Data source: OpenChargeMap

Top attractions along the route

No notable attractions were found along this route.

Find hotels near Barrow Gurney

Rent a car near Cambridge Batch

Popular routes from destination

Popular destinations close by

Sources

Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

Questions and answers

How far is it from Cambridge Batch to Barrow Gurney?
The distance between Cambridge Batch and Barrow Gurney is 2 mi by road.
How long does it take to drive from Cambridge Batch to Barrow Gurney?
The drive from Cambridge Batch to Barrow Gurney takes approximately 5 min by car.
What is the best route from Cambridge Batch to Barrow Gurney?
The fastest route from Cambridge Batch to Barrow Gurney covers 2 mi with a driving time of approximately 5 min.
Which direction is Barrow Gurney from Cambridge Batch?
Barrow Gurney lies roughly to the south-east of Cambridge Batch.
Are there charging stations between Cambridge Batch and Barrow Gurney?
Yes. You can charge along the route from Cambridge Batch to Barrow Gurney, including John Lewis, Bristol (250 kW); 95 Newfoundland Road, Bristol (150 kW); Arnos Vale, Bristol (150 kW). Charging points on this route: 173.

Share Route

Save for offline?

We'll download this route and its map area so it works without a connection. This can take a moment -- you can keep using the app while it finishes.