ColnbrookStoke Green
Start a new route?
Driving from Colnbrook to Stoke Green takes about via A4. The distance is 5 mi. The straight-line distance is 5 mi. Driving directions
Driving directions
19 · 5 mi- 1 Depart right onto Mill Street 48 yd
- 2 Turn slightly left onto Vicarage Way 16 yd
- 3 Turn right onto High Street 1 mi
- 4 At end of road, turn right onto High Street 1 mi
- 5 Continue straight onto London Road 135 yd
- 6 Turn right onto London Road 1 mi
- 7 Enter rotary straight onto London Road 1 mi
- 8 Exit rotary straight onto London Road 2 mi
- 9 Continue straight onto Sussex Place 157 yd
- 10 Continue straight onto Wellington Street 1 mi
- 11 Turn slightly right 81 yd
- 12 Turn right onto Wexham Road 1 mi
- 13 Enter roundabout left onto Wexham Road 31 yd
- 14 Exit roundabout left onto Wexham Road 1 mi
- 15 Enter roundabout slightly left onto Wexham Road 28 yd
- 16 Exit roundabout left onto Wexham Road 1 mi
- 17 Enter roundabout slightly left onto Stoke Green 17 yd
- 18 Exit roundabout left onto Stoke Green 24 yd
- 19 Arrive onto Stoke Green
The return trip from Stoke Green to Colnbrook covers roughly the same distance, 5 mi.
Popular destinations close by
Questions and answers
Stoke Green lies roughly to the north-west of Colnbrook.
How far is it from Colnbrook to Stoke Green?
The distance between Colnbrook and Stoke Green is 5 mi by road.
How long does it take to drive from Colnbrook to Stoke Green?
The drive from Colnbrook to Stoke Green takes approximately 15 min by car.
What is the best route from Colnbrook to Stoke Green?
The fastest route from Colnbrook to Stoke Green covers 5 mi with a driving time of approximately 15 min.
What is the shortest route from Colnbrook to Stoke Green?
The shortest driving route from Colnbrook to Stoke Green is about 5 mi by road.
Are there charging stations between Colnbrook and Stoke Green?
Yes. You can charge along the route from Colnbrook to Stoke Green, including Albert Street, Slough (350 kW), Extra Beaconsfield Services, Beaconsfield (350 kW), M4 Motorway Eastbound, Jct 2/3, Heston (350 kW). Charging points on this route: 763.
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .

