Table of contents
Along the way
2Charging points along the way
2 chargers
Longest stretch on this route with no charging point: 249 km
- 10 Lower Jarvis Street, Toronto150 kW
- 472 Bayfield Street, Barrie150 kW
Data source: OpenChargeMap
Top attractions along the route
No notable attractions were found along this route.
Book
2Find hotels near Toronto, ON
Rent a car near North Bay, ON
Explore
Popular routes from destination
Popular destinations close by
Toronto, ON → Oshawa, ONToronto, ON → Whitby, ONToronto, ON → Richmond Hill, ONToronto, ON → Markham, ONToronto, ON → Pickering, ONToronto, ON → Stouffville, ON
Sources
Distance and drive time are computed from OpenStreetMap road data with the OSRM routing engine. Updated .
Overview
Questions and answers
- How far is it from North Bay, ON, {fromState} to Toronto, ON, {toState}?
- The distance between North Bay, ON, {fromState} and Toronto, ON, {toState} is 344 km by road.
- How long does it take to drive from North Bay, ON, {fromState} to Toronto, ON, {toState}?
- The drive from North Bay, ON, {fromState} to Toronto, ON, {toState} takes approximately 4 h 45 min by car.
- What is the best route from North Bay, ON, {fromState} to Toronto, ON, {toState}?
- The fastest route from North Bay, ON, {fromState} to Toronto, ON, {toState} covers 344 km with a driving time of approximately 4 h 45 min.
- Which direction is Toronto, ON from North Bay, ON?
- Toronto, ON lies roughly to the south of North Bay, ON.
- Which roads does the route from North Bay, ON to Toronto, ON follow?
- The drive from North Bay, ON to Toronto, ON mainly follows 11, 400. The longest single stretch is 163 km on 11.
- Which towns do you pass between North Bay, ON and Toronto, ON?
- Towns on the route from North Bay, ON to Toronto, ON include Callander, Strong, Huntsville, Barrie, Vaughan.
- Are there charging stations between North Bay, ON and Toronto, ON?
- Yes. You can charge along the route from North Bay, ON to Toronto, ON, including 10 Lower Jarvis Street, Toronto (150 kW); 472 Bayfield Street, Barrie (150 kW). Charging points on this route: 2.
